Name : Mr Chin Wai Meng Address : Shah Alam, Selangor
Date of Birth (Age): 18 Nov 1985 (37) Marital Status : Married Nationality : Malaysian
Language spoken : English, Mandarin, Cantonese and Bahasa Melayu Availability : Immediately
Education Background
Diploma in Banking & Finance
Help University College , 2003 -- 2005
SPM
SMK Taman Sri Muda, 1998 -- 2002
Professional Training
In house training on Automated Phase Array Testing and interpretation by AGR In house training on conventional Phase Array Testing
In house training on TOFD (Time Of Flight Diffraction) Testing ASNT Level II PT/ MT / RT / UT conducted by KPG Synergy
Automated Ultrasonic Testing (AUT) training by Shaw Pipeline Services Attended CWSIP 3.1 Welding Inspector
(TWI) Attended RBI COURSE ( ABB UK) UT Level 2 ( TWI )
Certified Welding Inspector ( TWI)
Certified Internal Auditor ( ISO 9001 ) DNV Boset ( SEQU) ASNT Level 3 & ASNT Level 3 Basic (TWI)
Knowledge
Knowledge of AWS , API 4F, ASTM DNV OS 101, ASME ,ATEX and CE Marking Piping ( Duplex , Inconel , Alloy , Carbon Steel , Stainless steel )
Mechanical ( Rotating and Static )
Basic NACE understanding
Welding process SMAW, GTAW, SAW, FCAW Internal Auditor ISO 9001
Basic Knowledge of HSE Project management Project costing
Electrical and instrument
Company Name Type of industry
PositionTitle Duration
: : :
:
General Electric
Power Plant HRSG TFA
Dec 22 till August 23
Project Involved : Edra
Client : Edra
Project Name : Edra track 4B Working Loaction : Malaysia
Responsibility
Monitor all the work in progress and reporting to Site Manager /Project Manager for the block Outage
Daily meeting with contractor and vendor for progress such as progress , new FMI and mechanical package
Review all the mechanical and piping package
Prepare all the daily activities according on the weekly vs daily schedule.
Repair the stack damper that rubbing to the stack damper wall
Review all the Permit to work(PTW) , LOTO (lock-out-tag-out) , review Hirarc before submitting to client for approval.
Cold commissioning of valve after repair.( Confirm the setpoints , stroking from CCR and Local.
To assist on all the WDR claims from Clients for HRSG
Advise on installing valve , flushing for boiler after repairing the tube bundle leakage
Company Name Type of industry
PositionTitle Duration
: : :
:
AHP industries sdn bhd
Biomass boiler and Coal Conveyor Senior Site Engineer
Feb 2022 till May2022
Project Involved : AHP Mentakab Client : AHP
Project Name : AHP
Working Loaction : Malaysia
Responsibility
Monitor all the work in progress and reporting to Site Manager /Project Manager
Daily meeting with contractor and vendor for progress such as delivery , progress , Quality issue , Drawings and claim for progress
Review all the mechanical and piping package
Prepare all the daily activities according on the weekly vs daily schedule.
Installation for new biomass boiler for 72mw from the running plant
Review all the Permit to work(PTW) , LOTO (lock-out-tag-out) , RT from contractor and vendor prior start work
Review all the red mark up drawing and advise on the piping routing and structure for the coal conveyor
Advise on installing valve , flushing for Boiler , installation on the coal conveyor system , piping for boiler including flange management
Review drawing as per ISO for the piping for Demin water tank for the new boiler
Preparing claim for contractor
Prepare punchlist and NCR to commissioning team ( handover)
Company Name
Type of industry PositionTitle
Duration
Project Involved
Client
Project Name
Working Loaction : Malaysia
Responsibility
Monitor all the work in progress and reporting to Site Manager
Weekly meeting with Client and contractor for progress and all the finding status
Review and monitoring all the mechanical package and minimize all the punchlist before handover to commissioning
Oversee installation and commissioning work for pressure temperature and flow transmitter.
Work through and ensure all operating safety and protection setpoints are tested during commissioning stages.
Review all the PTW and LOTO for specify equipment
Preparing outage list and closed out all the NCR and punch lists, valve installation after steam blow , piping rectification and mechanical rectification.
Piping scope
• HRSG high pressure for HP system , HRH system for all alloy material and carbon steel
( installation and new routing including site routing during new findings and for force
outage )
• Preparation for steam blowing , chemical cleaning , reinstate valve after
commissioning
• Drum checking after commissioning for HP, IP and LP drum
• Taking valve value during commissioning for valve opening and closing
• Manage for all the HP,IP and LP valve reinstatement after steam blow
• Isolate valve before steam blow and chemical cleaning
• Repairing for tube fin leakage including feedback to engineering about the RCA ,
method of statement of repair under Asme , liaise with DOSH and clients
• TOP walk down before Handover to commissioning
Structure and mechanical scope
• Review all the NCR and punchlist raised by client and discussed with engineering
• Installation of Desuperheater valve and final attemperator valve
• Repair and reallinged stack damper
• Repair the HP PCV valve
• Rectify the inlet duct structure due to flow turbulence by adding new plate
• Added new platform due to accessibility of the valve
• Installation and reinstatement of valve after steam blow
• Repair of condenser rubber lining
:
: :
:
GE Power
Power Plant
HRSG & Mechanical TA Feb 2021till Present
: Track 4B : EDRA
: Track 4B
• Assist of installation of condenser for the last units
• Line check for steam turbine and gas turbine during the Person in charge is not around
• Pump test for motor solo run , coupling and vibration
• Valve stroking and coupling
Company Name Type of industry
PositionTitle Duration
: : :
:
GE Power Power Plant
Site Quality Engineer / HRSG & BOP TA Nov 2019till Present
Project Involved : Track 4A Client : SPG Project Name : Track 4A Working Loaction : Malaysia
Responsibility
Assist TFA for their reinstatement package, Hydrotest , Bolt Tightening(Flange Management), NDT, review Test Package , Reinstatement and closing Punch list
Review and monitoring all the mechanical package and minimize all the punchlist before handover to commissioning
Monthly review on the finding status and assisting to close out Quality Alert and any new findings during the project
Monitor all the work in progress and reporting to Site Quality Manager
Weekly meeting with Client and contractor for progress and all the finding status
Doing piping modification , repair and reinstatement for HRSG including arranging manpower , job distribution to Subcontractor and reporting all finding to Site Manager
Prior to accept new permit identify the hazards such as lifting , NDT and isolation of valve to minimize work schedule that will impact the job schedule
Work closely with PTW coordinator for permit release for HRSG and WSC
Piping scope
• repair all the damage pipe during outage ( high pressure system)
• Repair all the tube bundle leakage due to socket welding including NDT , PWHT and
hardness test ( prepare RCA to client )
• Rerouting new piping due to site condition
• Condenser dump tube repair and new installation
• Preparation for steam blowing , chemical cleaning , reinstate valve after
commissioning
• Drum checking after commissioning for HP, IP and LP drum
• Taking valve value during commissioning for valve opening and closing
• Manage for all the HP,IP and LP valve reinstatement after steam blow
• Isolate valve before steam blow and chemical cleaning
• Confirm all the valve KKS before TOP
Mechanical scope
• repair stack damper to avoid shaft dislocated
• Assist to repair all the ByPass valve
• Repair the HPOT bundle due to pin dislocated from the original position
• Repair HPOT module sliding plate
• Repair the terminal attemperator and final desuperheater
• Alignment of Steam turbine HP IP And LP
• Assist on installation on the pedestal bearing
• Assist and line check on all ST piping
• Assist installation on bearing 1 to bearing 8
• Witness casing installation for rotor
• Steam turbine and Gas turbine installation checking and alignment
Company Name Type of industry
PositionTitle Duration
: : :
:
Sembawang Marine Oil / Gas/Petroleum
Project Auditor May 2019-Jun 2019
Project Involved : Shell Vito Client : Shell Vito Project Name : Shell Vito
Working Loaction : Singapore / Malaysia / Thailand
Responsibility
Audit on new vendor according to Project requirement and Shell project Specification (DEP Standard)
Review all ISO document and previous project that been handle by new vendor or fabricator prior awarded to them
Monthly review on the finding status and assisting to close out NCR or any new findings during the project
Audit their personnel on the knowledge for the project
Weekly meeting with all the Resident Inspector to find out if there is any new findings from Shell or any fabrication issue
Company Name Type of industry Position Title Duration
: : :
:
: :
Linde Malaysia Oil/Gas/Petroleum
Project Engineer Jan 2019 – Arpil 2019
Separation Units Linde
ASU Malaysia Malaysia
Project Involved Client
Project Name
: Working Loaction :
Responsibility
Review all the drawing before installation of the ASU
Review the mechanical package
Walkdown with clients
Liaise with owner engineer to verify that all the lifting , JHA ,HAZOP before any lifting as this is brownfield plant
Ensure that all the piping is complete with NDT and Hydrotest
Walkdown with contractor for all the valves is install correctly with all the proper gasket and torque
Handover all the punchlist/ open items to commissioning
Company Name Type of industry Position Title Duration
Responsibility
To assist on the final documentation submission
Review and close punch list before load out
Final visual inspection on skids and Treating Iron
Coordinate with DNV for drop and load test and MPI on all the skids Witness all load and drop test
Review all ndt report prior load out
Project Involved Client
Project Name
: : :
:
: :
Sinopec Oil/Gas/Petroleum
Vendor Inspector May 2018-Jun 2018
SLB Sinopec
SLB
Shenzhen / China
: Working Loaction :
Company Name Type of industry Position Title Duration
: : :
:
Tuv Sud
Oil / Gas / Petroleum
Surveyor
Nov 2017 – Feb 2018
Jimah Power Plant & Genting Highland Roller
Jimah Power Plant & Cavux Selangor & Negeri Sembilan
Project Involved: Client : Coaster
Project Name : Working Loaction :
Responsibility
Ensure all materials used are within the specification
Perform visual inspection and dimension checking
GRP piping for boiler
Monitoring all fit up and hold point as per itp with advise to contractor
Ensure all manpower in place
Conduct visual inspection of weldment for plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress
Installation pressure vessel and piping Weekly report to Client Collaborate with TNB and Hitachi for all internal installation
Review inspection activities as per ITP
Company Name Type of industry Position Title Duration
: :
: :
Dar Petroleum
Oil / Gas / Petroleum
Surveyor
May 2017 – Nov 2017
GPOC
Sinopec & Petronas
DPOC Malakal
South Sudan / WAU & Juba
Project Involved Client
Project Name Working Loaction :
Company Name Type of industry: Position Title
Duration
:
: :
Jurong Shipyard Pte Ltd Oil / Gas / Petroleum
Surveyor
Dec 2015 – Oct 2016
OOGTK libra & TEEKAY offshore FPSO Pioneiro De Libra
Shah Alam / Taiwan / Brazil / China
Project Involved: Client : Project Name : Working Loaction :
: :
:
Responsibility
Ensure all materials used are within the specification
Perform visual inspection and dimension checking
Raised maintenance inspection for Land Rig and pipeline to downstream
Including all the drilling tools tools using API spec
Monitoring all fit up and hold point as per itp with advise to contractor
Ensure all manpower in place
Conduct visual inspection of weldment for plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress
Weekly report to Client
Review inspection activities as per ITP
Painting and blasting with all the checking such as salt test, surface prep
Responsibility
Ensure all materials used are within the specification Perform visual inspection and dimension checking Complied to NR 13 brazil statutory
Monitoring all fit up and hold point as per itp with advise to contractor Ensure all manpower in place
Witness Hydrotest and review Hydrotest procedure prior to the test
Conduct visual inspection of weldment for plate , piping and structural before, during and after welding
Monitor all the piping package for GRP piping
GRP piping for Living quarters
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure
Performed fit up and visual on all welding joint
Monitoring on daily work progress
Installation pressure vessel and piping Weekly report to Client
Collaborate with FMC and overlook Honeywell for all internal installation on the Pressure Vessel
Review inspection activities as per ITP
Painting and blasting with all the checking such as salt test, surface prep
Working Experience
Company Name Type of industry Position Title
Duration
: :
: :
Dynamic Oilfield Oil/Gas/Petroleum
Surveyor
August 2015 – Nov 2015
Petronas
IMDG,ISO,DNV Skids ( Gas Rack ) 40 Units
Labuan
Project Involved: Client : Project Name : Working Loaction :
Responsibility
Ensure all materials used are within the specification Perform visual inspection and dimension checking
Conduct visual inspection of weldment for plate, piping and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress
Weekly report to Client
Review inspection activities as per ITP
Painting and blasting with all the checking such as salt test, surface prep
Witnessed and Review Load and Drop Test procedure All skids is comply to IMDG,ISO and DNV 2.7-1
Working Experience
Company Name Type of industry Position Title Duration
Project Involved: Client : Project Name : Working Loaction :
Expro PTI
Oil / Gas / Petroleum
Surveyor
Jun 2015 – August 2015
Petronas
Compact Low Pressure Seperator
Sumandak A
:
: : :
Responsibility
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure
Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural.
Monitoring ,witnessed and arranging on all NDT work , habitat and scaffolding
Monitoring on welders and fit up before,during and after welding Compile and review documentation
Inspection on all incoming material including heat--treatment
Review all QA QC documents and ITP
Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client
Per--commissioning of piping as per P&ID and FAT and installation of the CLPS tank Ensure safety is in place
Working Experience
Company Name Type of industry Position Title Duration
: :
: :
DNV
Oil / Gas / Petroleum
Surveyor
Nov 2014 – May 2015
Whiteheaven Stone Mauless Creek Coal
China,Guangzhou
Project Involved: Client :
Project Name Working Loaction :
:
Responsibility
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure
Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural. Monitoring ,witnessed and arranging on all NDT work
Monitoring on welders and fit up before,during and after welding Compile and review documentation
Inspection on all incoming material including heat--treatment
Witnessed all A370 mechanical testing, chemical analysis and bend test
Witnessed all load test
Dimension control of all the items
Review all QA QC documents and ITP , Ensure all spec is accordance to AWS D1.1 , API and DNV
Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client
Compile and review all documents before issue IRN
Keep up the schedule before delivery preshipment inspection
Per--commissioning
Painting and blasting with all the checking such as salt test, surface prep Ensure safety is in place
Company Name Type of industry
Position Title Duration
: : :
:
Mahkota Maju
Oil / Gas / Petroleum
Vendor Inspector Sept 3 2014-Oct 16 2014
Shell Brunei Shell Brunei
Brunei / Miri offshore
Project Involved: Client
Project Name Working Loaction :
Company Name Type of industry Position Title
Duration
Project Involved: Client :
: Vantage Oilfield Service
Project Name Working Loaction :
: :
Responsibility
To assist on the final documentation submission Review and close punch list before load out
Final visual inspection on skids
Coordinate with TUV Nord for drop and load test and MPI and UT on all the skids before load out
Witness all load and drop test Review all ndt report prior load out
: :
:
Oil/Gas/Petroleum QA/QC
Jan 15 2014 till August 20 2014
Shell / Halliburton MIDO Philippine Labuan / Johor
:
Responsibility
Fabrication Audit accordance to ISO 9001:2008
Job as per workpack
Ensure all fabricator comply to Shell requirement and HSE standard
Monitoring all welding activities and NDT
Ensure all materials used are within the specification Perform visual inspection and dimension checking
Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure
Ensure all material used as per CE Marking and ATEX ( Explosion Proof for all the instrument and Valve )
Liase with 3rd party for inspection
Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest on piping and pressure vessel Check all the painting and blasting
Review inspection activities as per ITP Witnessed NDT and PMI test Review MDR prior submission to client
Working Experience
Company Name Type of industry
Position Title Duration
:
: :
:
Vantage Oilfield Service
Oil / Gas / Petroleum Welding Inspector Dec 2013 till Jan 2014
Petronas / Baker Hughes D18-A
Bintulu Offshore
Project Involved: Client : Project Name : Working Loaction :
Responsibility
Site Visit before Installation Monitoring all welding activities and NDT
Ensure all the Treating Iron is as per Drawing Perform visual inspection and dimension checking
Installation of the Surge Tank, KOP, Atmospheric Tank ( Holding Tank ) as per the deck layout. Make sure all the Tie In point and piping is as per the P&ID
Attend the Hazord meeting
Daily report to Client
PMI test before the well service start
Working Experience
Company Name : Vantage Oilfield Service Type of industry : Oil / Gas / Petroleum
Position Title Duration
Project Involved: Client :
: Welding Inspector
: Nov 3 2013 till Nov 26 2013
Shell / Petronas / Murphy Oil Shell M1 / Semarang Foxtrot
Rawang & Nilai & Pasir Gudang
Project Name Working Loaction :
Project Involved: Client
Project Name Loaction
:
:
: :
:
Responsibility
Fabrication Audit accordance to ISO 9001:2008
Ensure all fabricator comply to Shell and Petronas requirement and HSE standard Monitoring all welding activities and NDT
Ensure all materials used are within the specification Perform visual inspection and dimension checking
Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest for piping and pressure vessel.
Review inspection activities as per ITP Witnessed NDT and PMI test Preparing MDR
Company Name Type of industry Position Title Duration
: :
:
SGS
Oil / Gas / Petroleum
Client Inspector
Oct 1 2013 till Oct 30 2013
Vale Beumer
Vale Beumer Conveyor Structure ( Lumut ) Working YongNam (YHL) Gelang Patah, Johor Malaysia
Responsibility
Monitoring all welding activities and NDT
Ensure all materials used are within the specification Perform visual inspection and dimension checking
Conduct visual inspection of weldment for pipe, plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural. Daily report and loading report from Outsource to Client
Monitoring all outsource progress for Hand Rail and Conveyor Structure Review inspection activities as per ITP
Witnessed all NDT test
Expediting all the structure prior to commissioning
Company Name : Type of industry: Position Title :
Duration :
Project Involved: Client : Project Name :
Working Loaction
Vantage Oilfield Service Oil / Gas / Petroleum
Welding Inspector July 2013 till Sept 2013
:
PWA System & Petrofac ( West Lutong ) PWA System ( Skids, Piping and Vessel )
Steelcon and Bukit Fraser, Nilai and Rawang, Malaysia
Responsibility
Monitoring all welding activities and NDT
Ensure all materials used are within the specification Perform visual inspection and dimension checking
Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest
Weekly report to Client
Review inspection activities as per ITP Witnessed NDT and PMI test
Expedite as per schedule
E&I inspection as per P&ID and pneumatic test on Valve Witnessed FAT
Witnessed and Review Load and Drop Test procedure All skids as per DNV 2.7--1 ,CE certification
Company Name Type of industry
Position Title Duration
: :
:
DNV
Oil / Gas / Petroleum
Welding Inspector Sept 2012 till May2013
:
Project Involved: Client : Project Name : Working Loaction :
Nabors Drilling
Nabors X Pace Rig 800 KIP
China, Chengdu ( Guanghan, HongHua )
Responsibility
Review and Witnessed WPS,WQT,NDT and PQR and repair procedure
Performed fit up and visual on all welding joint
Monitoring on daily work progress including piping and structural.
Monitoring ,witnessed and arranging on all NDT work
Monitoring on welders and fit up before,during and after welding
Compile and review documentation
Inspection on all incoming material including heat--treatment
Witnessed all A370 mechanical testing, chemical analysis and bend test
Witnessed all load test
Review all QA QC documents and ITP
Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client
Compile and review all documents before issue IRN
Keep up the schedule before delivery Preshipment inspection Per--commissioning
Company Name Type of industry
Position Title Duration
: KPG
: Oil / Gas / Petroleum
: QC Inspector
: Nov 2011 till August 2012
Projects / Business Deals Involved: Client : Wasco Energy
Project : Exxon , Tapis R Package Boiler & Skid Package Location : Kemaman , Terengganu & Shah Alam, Selangor
Responsibilities :
-- Review WPS, WQT and repair procedure.
-- Performed fit up and visual inspection on all welding joint.
-- Monitoring on daily work progress including piping, structural and instrumentations for Package Boiler and Skid Package
-- Monitoring and arranging on all the NDT work including TOFD, PAUT,UT MT and RT -- Monitoring on PWHT.
-- Interpretation and on all radiographic.
-- Monitoring on welders and prepare on welder performance records. -- Conduct line checking and hydrostatic test on all piping.
-- Compile all QC, Inspection reports and MDR.
MAR 2012– APRIL
Client: Aker Solution Sdn Bhd Title : Welding / Piping Inspector Project :Atwood Location
:PKFZ / Klang
Responsibilities:
1 Fabrication 198 sets of 21" Clip-on Drilling Riser pipe, Booster Lines, Superduplex Hydraulic Lines, Choke and Kill Lines, Main Pipe Riser Assembly and Buoyancy Installation.
Close up the NCR.
Welding Process applicant Orbital GTAW Automatic system, GTAW+SAW, SMAW and GTAW for Manual repair.
Crosscheck vendor semi auto Phase Array UT Inspection against Radiography Testing.
Monitoring Hardness Test, PWHT, PMI Test, Painting/Coating application, Pressure test, Lifting Lug Load Test, structure truss clamp fabrication, Riser configuration Test etc.
Review and comments QC documents - Welding, Painting, NDT report (UTTG, RT/Radiograph, PT, MT), PWHT pipe straightness inspection report etc
MAR 2012– APRIL
Client Title Project Location
:Sapura Acergy Sdn Bhd :NDT
:Sapura J--Lay Tower Maintenance :Pasir Gudang, Johor Baharu
Responsibilities:
Carried out Magnetic Particle Testing and Ultrasonic Testing on structure of J-- Lay Tower Visual Inspection on the structure of J--Lay Tower
FEB 2012– MAR 2012
Client Title Project Location
:AP Subsea / Sapura Acergy Sdn Bhd : NDT
:TNK Lando Vietnam :Kundang, Rawang
Responsibilities:
Carried out Radiography Testing on dissimilarJoint
X--Ray crawler engineer to carried out weld inspection on production pipeline
Operation of X--Ray crawler
Maintenance of the machine
Cladded and Chromium parent material with Inconel weld deposit Carried out visual inspection on circumferential butt weld risers
Ultrasonic Testing on circumferential butt weld risers
JAN 2012– FEB 2012
Client :AP Subsea / Sapura Acergy Sdn Bhd
Client Project Location
:NDT
:TNK Lando Vietnam
:Kundang, Rawang
Responsibility :
Carried out Radiography Testing on dissimilar Joint Cladded and Chromium parent material with Inconel weld deposit
Carried out visual inspection on repair circumferential butt weld risers DEC 2011– JAN 2012
Client
Title
Project
Location :Kuantan
Client Project Location
:Scomi Rail Berhad (Monorail Coporation) Title :NDT :Kuala Lumpur Monorail
:Bukit Beruntung, Rawang
:AP Subsea / Sapura Acergy Sdn Bhd : NDT
:TNK Lando Vietnam
Responsibilities:
Carried out Dye Penetrant Testing and Ultrasonic Testing on Cladded pipe and Chromium pipe for risers
Carried out visual inspection the surface of parent material before welding NOV 2011– DEC 2011
Responsibilities:
Carried out Radiography Testing on structure and chassis of monorail cabin
Carried out visual inspection on the flooring of monorail cabin
OCT 2011– NOV 2011
Client Project Location
:Scomi Rail Berhad (Monorail Coporation) Title :NDT : Mumbai Monorail
:Bukit Beruntung, Rawang
Responsibilities:
Carried out Radiography Testing on structure and chassis of monorail cabin
Carried out visual inspection on the flooring of monorail cabin
Computer Skills
Microsoft Office (Word, Power Point, Excel) AutoCAD (Begineer) SAP
Language
Spoken : English, Bahasa Malaysia, Mandarin, Cantonese Written : English, Bahasa Malaysia