看更多範本

未命名專案作品1


Name : Mr Chin Wai Meng Address : Shah Alam, Selangor

Date of Birth (Age): 18 Nov 1985 (37) Marital Status : Married Nationality : Malaysian

Language spoken : English, Mandarin, Cantonese and Bahasa Melayu Availability : Immediately

Education Background

Diploma in Banking & Finance

Help University College , 2003 -- 2005

SPM

SMK Taman Sri Muda, 1998 -- 2002

Professional Training

In house training on Automated Phase Array Testing and interpretation by AGR In house training on conventional Phase Array Testing

In house training on TOFD (Time Of Flight Diffraction) Testing ASNT Level II PT/ MT / RT / UT conducted by KPG Synergy

Automated Ultrasonic Testing (AUT) training by Shaw Pipeline Services Attended CWSIP 3.1 Welding Inspector

(TWI) Attended RBI COURSE ( ABB UK) UT Level 2 ( TWI )

Certified Welding Inspector ( TWI)

Certified Internal Auditor ( ISO 9001 ) DNV Boset ( SEQU) ASNT Level 3 & ASNT Level 3 Basic (TWI)

Knowledge

Knowledge of AWS , API 4F, ASTM DNV OS 101, ASME ,ATEX and CE Marking Piping ( Duplex , Inconel , Alloy , Carbon Steel , Stainless steel )

Mechanical ( Rotating and Static )

Basic NACE understanding

Welding process SMAW, GTAW, SAW, FCAW Internal Auditor ISO 9001

Basic Knowledge of HSE Project management Project costing

Electrical and instrument

  Company Name Type of industry

PositionTitle Duration

: : :

:

General Electric

Power Plant HRSG TFA

Dec 22 till August 23

Project Involved : Edra

Client : Edra

Project Name : Edra track 4B Working Loaction : Malaysia


Responsibility

Monitor all the work in progress and reporting to Site Manager /Project Manager for the block Outage

Daily meeting with contractor and vendor for progress such as progress , new FMI and mechanical package

Review all the mechanical and piping package

Prepare all the daily activities according on the weekly vs daily schedule.

Repair the stack damper that rubbing to the stack damper wall

Review all the Permit to work(PTW) , LOTO (lock-out-tag-out) , review Hirarc before submitting to client for approval.

Cold commissioning of valve after repair.( Confirm the setpoints , stroking from CCR and Local.

To assist on all the WDR claims from Clients for HRSG

Advise on installing valve , flushing for boiler after repairing the tube bundle leakage

Company Name Type of industry

PositionTitle Duration

: : :

:

AHP industries sdn bhd

Biomass boiler and Coal Conveyor Senior Site Engineer

Feb 2022 till May2022

Project Involved : AHP Mentakab Client : AHP

Project Name : AHP

Working Loaction : Malaysia

Responsibility

Monitor all the work in progress and reporting to Site Manager /Project Manager

Daily meeting with contractor and vendor for progress such as delivery , progress , Quality issue , Drawings and claim for progress

Review all the mechanical and piping package

Prepare all the daily activities according on the weekly vs daily schedule.

Installation for new biomass boiler for 72mw from the running plant

Review all the Permit to work(PTW) , LOTO (lock-out-tag-out) , RT from contractor and vendor prior start work

Review all the red mark up drawing and advise on the piping routing and structure for the coal conveyor

Advise on installing valve , flushing for Boiler , installation on the coal conveyor system , piping for boiler including flange management

Review drawing as per ISO for the piping for Demin water tank for the new boiler


Preparing claim for contractor

Prepare punchlist and NCR to commissioning team ( handover)

Company Name

Type of industry PositionTitle

Duration

Project Involved

Client

Project Name

Working Loaction : Malaysia

Responsibility

Monitor all the work in progress and reporting to Site Manager

Weekly meeting with Client and contractor for progress and all the finding status

Review and monitoring all the mechanical package and minimize all the punchlist before handover to commissioning

Oversee installation and commissioning work for pressure temperature and flow transmitter.

Work through and ensure all operating safety and protection setpoints are tested during commissioning stages.

Review all the PTW and LOTO for specify equipment

Preparing outage list and closed out all the NCR and punch lists, valve installation after steam blow , piping rectification and mechanical rectification.

Piping scope

• HRSG high pressure for HP system , HRH system for all alloy material and carbon steel

( installation and new routing including site routing during new findings and for force

outage )

• Preparation for steam blowing , chemical cleaning , reinstate valve after

commissioning

• Drum checking after commissioning for HP, IP and LP drum

• Taking valve value during commissioning for valve opening and closing

• Manage for all the HP,IP and LP valve reinstatement after steam blow

• Isolate valve before steam blow and chemical cleaning

• Repairing for tube fin leakage including feedback to engineering about the RCA ,

method of statement of repair under Asme , liaise with DOSH and clients

• TOP walk down before Handover to commissioning

Structure and mechanical scope

• Review all the NCR and punchlist raised by client and discussed with engineering

• Installation of Desuperheater valve and final attemperator valve

• Repair and reallinged stack damper

• Repair the HP PCV valve

• Rectify the inlet duct structure due to flow turbulence by adding new plate

• Added new platform due to accessibility of the valve

• Installation and reinstatement of valve after steam blow

• Repair of condenser rubber lining

:

: :

:

GE Power

Power Plant

HRSG & Mechanical TA Feb 2021till Present

: Track 4B : EDRA

: Track 4B


• Assist of installation of condenser for the last units

• Line check for steam turbine and gas turbine during the Person in charge is not around

• Pump test for motor solo run , coupling and vibration

• Valve stroking and coupling

Company Name Type of industry

PositionTitle Duration

: : :

:

GE Power Power Plant

Site Quality Engineer / HRSG & BOP TA Nov 2019till Present

Project Involved : Track 4A Client : SPG Project Name : Track 4A Working Loaction : Malaysia

Responsibility

Assist TFA for their reinstatement package, Hydrotest , Bolt Tightening(Flange Management), NDT, review Test Package , Reinstatement and closing Punch list

Review and monitoring all the mechanical package and minimize all the punchlist before handover to commissioning

Monthly review on the finding status and assisting to close out Quality Alert and any new findings during the project

Monitor all the work in progress and reporting to Site Quality Manager

Weekly meeting with Client and contractor for progress and all the finding status

Doing piping modification , repair and reinstatement for HRSG including arranging manpower , job distribution to Subcontractor and reporting all finding to Site Manager

Prior to accept new permit identify the hazards such as lifting , NDT and isolation of valve to minimize work schedule that will impact the job schedule

Work closely with PTW coordinator for permit release for HRSG and WSC

Piping scope

• repair all the damage pipe during outage ( high pressure system)

• Repair all the tube bundle leakage due to socket welding including NDT , PWHT and

hardness test ( prepare RCA to client )

• Rerouting new piping due to site condition

• Condenser dump tube repair and new installation

• Preparation for steam blowing , chemical cleaning , reinstate valve after

commissioning

• Drum checking after commissioning for HP, IP and LP drum

• Taking valve value during commissioning for valve opening and closing

• Manage for all the HP,IP and LP valve reinstatement after steam blow

• Isolate valve before steam blow and chemical cleaning

• Confirm all the valve KKS before TOP

Mechanical scope

• repair stack damper to avoid shaft dislocated

• Assist to repair all the ByPass valve

• Repair the HPOT bundle due to pin dislocated from the original position

• Repair HPOT module sliding plate

• Repair the terminal attemperator and final desuperheater

• Alignment of Steam turbine HP IP And LP

• Assist on installation on the pedestal bearing


• Assist and line check on all ST piping

• Assist installation on bearing 1 to bearing 8

• Witness casing installation for rotor

• Steam turbine and Gas turbine installation checking and alignment

Company Name Type of industry

PositionTitle Duration

: : :

:

Sembawang Marine Oil / Gas/Petroleum

Project Auditor May 2019-Jun 2019

Project Involved : Shell Vito Client : Shell Vito Project Name : Shell Vito

Working Loaction : Singapore / Malaysia / Thailand

Responsibility

Audit on new vendor according to Project requirement and Shell project Specification (DEP Standard)

Review all ISO document and previous project that been handle by new vendor or fabricator prior awarded to them

Monthly review on the finding status and assisting to close out NCR or any new findings during the project

Audit their personnel on the knowledge for the project

Weekly meeting with all the Resident Inspector to find out if there is any new findings from Shell or any fabrication issue

Company Name Type of industry Position Title Duration

: : :

:

: :

Linde Malaysia Oil/Gas/Petroleum

Project Engineer Jan 2019 – Arpil 2019

Separation Units Linde

ASU Malaysia Malaysia

Project Involved Client

Project Name

: Working Loaction :

Responsibility

Review all the drawing before installation of the ASU

Review the mechanical package

Walkdown with clients

Liaise with owner engineer to verify that all the lifting , JHA ,HAZOP before any lifting as this is brownfield plant

Ensure that all the piping is complete with NDT and Hydrotest

Walkdown with contractor for all the valves is install correctly with all the proper gasket and torque

Handover all the punchlist/ open items to commissioning


Company Name Type of industry Position Title Duration

Responsibility

To assist on the final documentation submission

Review and close punch list before load out

Final visual inspection on skids and Treating Iron

Coordinate with DNV for drop and load test and MPI on all the skids Witness all load and drop test

Review all ndt report prior load out

Project Involved Client

Project Name

: : :

:

: :

Sinopec Oil/Gas/Petroleum

Vendor Inspector May 2018-Jun 2018

SLB Sinopec

SLB

Shenzhen / China

: Working Loaction :

Company Name Type of industry Position Title Duration

: : :

:

Tuv Sud

Oil / Gas / Petroleum

Surveyor

Nov 2017 – Feb 2018

Jimah Power Plant & Genting Highland Roller

Jimah Power Plant & Cavux Selangor & Negeri Sembilan

Project Involved: Client : Coaster

Project Name : Working Loaction :

Responsibility

Ensure all materials used are within the specification

Perform visual inspection and dimension checking

GRP piping for boiler

Monitoring all fit up and hold point as per itp with advise to contractor

Ensure all manpower in place

Conduct visual inspection of weldment for plate and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress

Installation pressure vessel and piping Weekly report to Client Collaborate with TNB and Hitachi for all internal installation


Review inspection activities as per ITP

Company Name Type of industry Position Title Duration

: :

: :

Dar Petroleum

Oil / Gas / Petroleum

Surveyor

May 2017 – Nov 2017

GPOC

Sinopec & Petronas

DPOC Malakal

South Sudan / WAU & Juba

Project Involved Client

Project Name Working Loaction :

Company Name Type of industry: Position Title

Duration

:

: :

Jurong Shipyard Pte Ltd Oil / Gas / Petroleum

Surveyor

Dec 2015 – Oct 2016

OOGTK libra & TEEKAY offshore FPSO Pioneiro De Libra

Shah Alam / Taiwan / Brazil / China

Project Involved: Client : Project Name : Working Loaction :

: :

:

Responsibility

Ensure all materials used are within the specification

Perform visual inspection and dimension checking

Raised maintenance inspection for Land Rig and pipeline to downstream

Including all the drilling tools tools using API spec

Monitoring all fit up and hold point as per itp with advise to contractor

Ensure all manpower in place

Conduct visual inspection of weldment for plate and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress

Weekly report to Client

Review inspection activities as per ITP

Painting and blasting with all the checking such as salt test, surface prep

Responsibility

Ensure all materials used are within the specification Perform visual inspection and dimension checking Complied to NR 13 brazil statutory

Monitoring all fit up and hold point as per itp with advise to contractor Ensure all manpower in place


Witness Hydrotest and review Hydrotest procedure prior to the test

Conduct visual inspection of weldment for plate , piping and structural before, during and after welding

Monitor all the piping package for GRP piping

GRP piping for Living quarters

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure

Performed fit up and visual on all welding joint

Monitoring on daily work progress

Installation pressure vessel and piping Weekly report to Client

Collaborate with FMC and overlook Honeywell for all internal installation on the Pressure Vessel

Review inspection activities as per ITP

Painting and blasting with all the checking such as salt test, surface prep

Working Experience

 Company Name Type of industry Position Title

Duration

: :

: :

Dynamic Oilfield Oil/Gas/Petroleum

Surveyor

August 2015 – Nov 2015

Petronas

IMDG,ISO,DNV Skids ( Gas Rack ) 40 Units

Labuan

Project Involved: Client : Project Name : Working Loaction :

Responsibility

Ensure all materials used are within the specification Perform visual inspection and dimension checking

Conduct visual inspection of weldment for plate, piping and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress

Weekly report to Client

Review inspection activities as per ITP

Painting and blasting with all the checking such as salt test, surface prep

Witnessed and Review Load and Drop Test procedure All skids is comply to IMDG,ISO and DNV 2.7-1

Working Experience

 

Company Name Type of industry Position Title Duration

Project Involved: Client : Project Name : Working Loaction :

Expro PTI

Oil / Gas / Petroleum

Surveyor

Jun 2015 – August 2015

Petronas

Compact Low Pressure Seperator

Sumandak A

:

: : :

Responsibility

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure

Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural.

Monitoring ,witnessed and arranging on all NDT work , habitat and scaffolding

Monitoring on welders and fit up before,during and after welding Compile and review documentation

Inspection on all incoming material including heat--treatment

Review all QA QC documents and ITP

Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client

Per--commissioning of piping as per P&ID and FAT and installation of the CLPS tank Ensure safety is in place

Working Experience

 Company Name Type of industry Position Title Duration

: :

: :

DNV

Oil / Gas / Petroleum

Surveyor

Nov 2014 – May 2015

Whiteheaven Stone Mauless Creek Coal

China,Guangzhou

Project Involved: Client :

Project Name Working Loaction :

:

Responsibility

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure

Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural. Monitoring ,witnessed and arranging on all NDT work

Monitoring on welders and fit up before,during and after welding Compile and review documentation

Inspection on all incoming material including heat--treatment


Witnessed all A370 mechanical testing, chemical analysis and bend test

Witnessed all load test

Dimension control of all the items

Review all QA QC documents and ITP , Ensure all spec is accordance to AWS D1.1 , API and DNV

Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client

Compile and review all documents before issue IRN

Keep up the schedule before delivery preshipment inspection

Per--commissioning

Painting and blasting with all the checking such as salt test, surface prep Ensure safety is in place

Company Name Type of industry

Position Title Duration

: : :

:

Mahkota Maju

Oil / Gas / Petroleum

Vendor Inspector Sept 3 2014-Oct 16 2014

Shell Brunei Shell Brunei

Brunei / Miri offshore

Project Involved: Client

Project Name Working Loaction :

Company Name Type of industry Position Title

Duration

Project Involved: Client :

: Vantage Oilfield Service

Project Name Working Loaction :

: :

Responsibility

To assist on the final documentation submission Review and close punch list before load out

Final visual inspection on skids

Coordinate with TUV Nord for drop and load test and MPI and UT on all the skids before load out

Witness all load and drop test Review all ndt report prior load out

: :

:

Oil/Gas/Petroleum QA/QC

Jan 15 2014 till August 20 2014

Shell / Halliburton MIDO Philippine Labuan / Johor

:

Responsibility

Fabrication Audit accordance to ISO 9001:2008


Job as per workpack

Ensure all fabricator comply to Shell requirement and HSE standard

Monitoring all welding activities and NDT

Ensure all materials used are within the specification Perform visual inspection and dimension checking

Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure

Ensure all material used as per CE Marking and ATEX ( Explosion Proof for all the instrument and Valve )

Liase with 3rd party for inspection

Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest on piping and pressure vessel Check all the painting and blasting

Review inspection activities as per ITP Witnessed NDT and PMI test Review MDR prior submission to client

Working Experience

 Company Name Type of industry

Position Title Duration

:

: :

:

Vantage Oilfield Service

Oil / Gas / Petroleum Welding Inspector Dec 2013 till Jan 2014

Petronas / Baker Hughes D18-A

Bintulu Offshore

Project Involved: Client : Project Name : Working Loaction :

Responsibility

Site Visit before Installation Monitoring all welding activities and NDT

Ensure all the Treating Iron is as per Drawing Perform visual inspection and dimension checking

Installation of the Surge Tank, KOP, Atmospheric Tank ( Holding Tank ) as per the deck layout. Make sure all the Tie In point and piping is as per the P&ID

Attend the Hazord meeting

Daily report to Client


PMI test before the well service start

Working Experience

Company Name : Vantage Oilfield Service Type of industry : Oil / Gas / Petroleum

 Position Title Duration

Project Involved: Client :

: Welding Inspector

: Nov 3 2013 till Nov 26 2013

Shell / Petronas / Murphy Oil Shell M1 / Semarang Foxtrot

Rawang & Nilai & Pasir Gudang

Project Name Working Loaction :

Project Involved: Client

Project Name Loaction

:

:

: :

:

Responsibility

Fabrication Audit accordance to ISO 9001:2008

Ensure all fabricator comply to Shell and Petronas requirement and HSE standard Monitoring all welding activities and NDT

Ensure all materials used are within the specification Perform visual inspection and dimension checking

Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest for piping and pressure vessel.

Review inspection activities as per ITP Witnessed NDT and PMI test Preparing MDR

Company Name Type of industry Position Title Duration

: :

:

SGS

Oil / Gas / Petroleum

Client Inspector

Oct 1 2013 till Oct 30 2013

Vale Beumer

Vale Beumer Conveyor Structure ( Lumut ) Working YongNam (YHL) Gelang Patah, Johor Malaysia

Responsibility

Monitoring all welding activities and NDT

Ensure all materials used are within the specification Perform visual inspection and dimension checking

Conduct visual inspection of weldment for pipe, plate and structural before, during and after welding


Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural. Daily report and loading report from Outsource to Client

Monitoring all outsource progress for Hand Rail and Conveyor Structure Review inspection activities as per ITP

Witnessed all NDT test

Expediting all the structure prior to commissioning

Company Name : Type of industry: Position Title :

Duration :

Project Involved: Client : Project Name :

Working Loaction

Vantage Oilfield Service Oil / Gas / Petroleum

Welding Inspector July 2013 till Sept 2013

:

PWA System & Petrofac ( West Lutong ) PWA System ( Skids, Piping and Vessel )

Steelcon and Bukit Fraser, Nilai and Rawang, Malaysia

Responsibility

Monitoring all welding activities and NDT

Ensure all materials used are within the specification Perform visual inspection and dimension checking

Conduct visual inspection of weldment for pipe, nozzle, plate and structural before, during and after welding

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural. Witnessed PWHT and Hydrotest

Weekly report to Client

Review inspection activities as per ITP Witnessed NDT and PMI test

Expedite as per schedule

E&I inspection as per P&ID and pneumatic test on Valve Witnessed FAT

Witnessed and Review Load and Drop Test procedure All skids as per DNV 2.7--1 ,CE certification

Company Name Type of industry

Position Title Duration

: :

:

DNV

Oil / Gas / Petroleum

Welding Inspector Sept 2012 till May2013

:


Project Involved: Client : Project Name : Working Loaction :

Nabors Drilling

Nabors X Pace Rig 800 KIP

China, Chengdu ( Guanghan, HongHua )

Responsibility

Review and Witnessed WPS,WQT,NDT and PQR and repair procedure

Performed fit up and visual on all welding joint

Monitoring on daily work progress including piping and structural.

Monitoring ,witnessed and arranging on all NDT work

Monitoring on welders and fit up before,during and after welding

Compile and review documentation

Inspection on all incoming material including heat--treatment

Witnessed all A370 mechanical testing, chemical analysis and bend test

Witnessed all load test

Review all QA QC documents and ITP

Review all mechanical and chemical analysis report Inspection as per client requirement Provide weekly report to Client

Compile and review all documents before issue IRN

Keep up the schedule before delivery Preshipment inspection Per--commissioning

Company Name Type of industry

Position Title Duration

: KPG

: Oil / Gas / Petroleum

: QC Inspector

: Nov 2011 till August 2012

Projects / Business Deals Involved: Client : Wasco Energy

Project : Exxon , Tapis R Package Boiler & Skid Package Location : Kemaman , Terengganu & Shah Alam, Selangor

Responsibilities :

-- Review WPS, WQT and repair procedure.

-- Performed fit up and visual inspection on all welding joint.

-- Monitoring on daily work progress including piping, structural and instrumentations for Package Boiler and Skid Package

-- Monitoring and arranging on all the NDT work including TOFD, PAUT,UT MT and RT -- Monitoring on PWHT.

 

-- Interpretation and on all radiographic.

-- Monitoring on welders and prepare on welder performance records. -- Conduct line checking and hydrostatic test on all piping.

-- Compile all QC, Inspection reports and MDR.

MAR 2012– APRIL

Client: Aker Solution Sdn Bhd Title : Welding / Piping Inspector Project :Atwood Location

:PKFZ / Klang

Responsibilities:

1 Fabrication 198 sets of 21" Clip-on Drilling Riser pipe, Booster Lines, Superduplex Hydraulic Lines, Choke and Kill Lines, Main Pipe Riser Assembly and Buoyancy Installation.

Close up the NCR.

Welding Process applicant Orbital GTAW Automatic system, GTAW+SAW, SMAW and GTAW for Manual repair.

Crosscheck vendor semi auto Phase Array UT Inspection against Radiography Testing.

Monitoring Hardness Test, PWHT, PMI Test, Painting/Coating application, Pressure test, Lifting Lug Load Test, structure truss clamp fabrication, Riser configuration Test etc.

Review and comments QC documents - Welding, Painting, NDT report (UTTG, RT/Radiograph, PT, MT), PWHT pipe straightness inspection report etc

MAR 2012– APRIL

Client Title Project Location

:Sapura Acergy Sdn Bhd :NDT

:Sapura J--Lay Tower Maintenance :Pasir Gudang, Johor Baharu

Responsibilities:

Carried out Magnetic Particle Testing and Ultrasonic Testing on structure of J-- Lay Tower Visual Inspection on the structure of J--Lay Tower

FEB 2012– MAR 2012

Client Title Project Location

:AP Subsea / Sapura Acergy Sdn Bhd : NDT

:TNK Lando Vietnam :Kundang, Rawang

Responsibilities:

Carried out Radiography Testing on dissimilarJoint

X--Ray crawler engineer to carried out weld inspection on production pipeline

Operation of X--Ray crawler

Maintenance of the machine

Cladded and Chromium parent material with Inconel weld deposit Carried out visual inspection on circumferential butt weld risers

Ultrasonic Testing on circumferential butt weld risers

JAN 2012– FEB 2012

Client :AP Subsea / Sapura Acergy Sdn Bhd


Client Project Location

:NDT

:TNK Lando Vietnam

:Kundang, Rawang

Responsibility :

Carried out Radiography Testing on dissimilar Joint Cladded and Chromium parent material with Inconel weld deposit

Carried out visual inspection on repair circumferential butt weld risers DEC 2011– JAN 2012

Client

Title

Project

Location :Kuantan

Client Project Location

:Scomi Rail Berhad (Monorail Coporation) Title :NDT :Kuala Lumpur Monorail

:Bukit Beruntung, Rawang

:AP Subsea / Sapura Acergy Sdn Bhd : NDT

:TNK Lando Vietnam

Responsibilities:

Carried out Dye Penetrant Testing and Ultrasonic Testing on Cladded pipe and Chromium pipe for risers

Carried out visual inspection the surface of parent material before welding NOV 2011– DEC 2011

Responsibilities:

Carried out Radiography Testing on structure and chassis of monorail cabin

Carried out visual inspection on the flooring of monorail cabin

OCT 2011– NOV 2011

Client Project Location

:Scomi Rail Berhad (Monorail Coporation) Title :NDT : Mumbai Monorail

:Bukit Beruntung, Rawang

Responsibilities:

Carried out Radiography Testing on structure and chassis of monorail cabin

Carried out visual inspection on the flooring of monorail cabin

Computer Skills

Microsoft Office (Word, Power Point, Excel) AutoCAD (Begineer) SAP

Language

Spoken : English, Bahasa Malaysia, Mandarin, Cantonese Written : English, Bahasa Malaysia

  

未命名專案作品1
2023/10/03130
未命名專案作品1
2023/10/03130